2 mva HSSP Electric Power ARC Oil Immersed Induction Melting Furnace Transformer Price

FOB Reference Price:Get Latest Price
$25,000.00 - $78,000.00 / Set | 1 Set/Sets Power transformer price (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
YUANGUANG
Model Number:
HSSP-8000/11
Usage:
Power
Phase:
Three
Coil Structure:
Toroidal
Coil Number:
Autotransformer
Tap changer:
NLTC/OLTC
Cooling type:
OFWF
High voltage range:
6-11kV
Rated power range:
630-8000kVA
Connection Symbol:
Dd0 Dy11
Windings material:
Copper
Iron core:
Silicon sheet
Standards:
IEC,GB,ANSI
Transformer:
Power transformer price
Losses:
Low losses
Supply Ability
Supply Ability:
5000 Set/Sets per Year Power transformer price
Packaging & Delivery
Packaging Details
Power Transformer main body in nude , the accessories packing in seaworthy standard wooden case
Port
Shanghai / Ningbo
Lead Time :
Arc furnace transformer 35-60 days

 

 

Product Description

1.Pictures Of  Power transformer price

2.Descriptions Of  Power transformer price 

furnace transformer   electric arc furnace transformer   electric transformer 
1Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. 
2 Arc furnace transformers used for steel-smelting 
3including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type
4Blast furnace transformers used for semlting of iron alloy, silicides, calcium  carbide
5single phase, three phase, load ratio voltage regulator and no-load voltage regulator
6All are energy-saving products with low power loss. 
7Furnace transformers cooling modes are  self-cooling mode,   forced water cooling mode.

 

you may like

3. More Products To Choose 

        power transformer                  oil immersed transformer            furnace transformer        power transformer

    Pad-mounted Transformer           dry type transformer           distribution transformer         transformer substation     

4. Product Structure Diagram And Quality Control

 

Technical Parameters

5.Technical Parameters Of Product

Arc furnace transformers Main Technical Parameters for HSSPZ, HSSP, HSSPK, HJSSP, HJSSPZ Series

6kV-11kV Level Arc furnace transformer: 

Rated power (kVA)Primary voltage (kV)Secondary Step Voltage (v)Rated Secondary Current (A)Connection  symbolShort-Circuit impedance (%)Type of tapingNo-load loss(W)On-load loss(W)
630
300
1000
6
6.3
10
10.5
11
200
170
116
98
1819
2609
2887
Dd0
Dy11
S-9






7-S
no-load tap changing2.48.6
2.711.0
3.114.0
1250
1600
2000
210
180
121
104
3437
4399
5499
3.617.5
4.122.0
4.627.0
2500
3150
220
190
127
110
6561
8267
5.232.0
6.039.0
4000
5000
240
210
130
121
9623
12023
7.646.0
9.454.0
6300
3000
260
240
210
139
13900
17765
11.363.0
15.074.0

6.Certifications And Workshop Of Product

7.Function And Features Of Product

On-load-tap-changing Electric Arc Furnace Transformer  
1)Low loss4)High efficiency 7)Pretty outline and compact structure
2)Low noise5)Easy maintenance8)100% guaranteed no leakage
3)Operation reliability 6)Low partial discharge 9)Strong mechanical strength and short-circuit with

 

Electric Arc Furnace Transformer Introduction to Products
1Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. 
2 Arc furnace transformers used for steel-smelting 
3including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type
4Furnace transformers used for semlting of iron alloy, silicides, calcium  carbide
5Load ratio voltage regulator and no-load voltage regulator
6All are energy-saving products with low power loss. 
7Transformers cooling modes are self-cooling mode, forced water cooling mode.

8.Installation And Packing Of Product

 

Our Services

9. Our Best Service For You

1.Pre sale service
a.make technical solution
b.send quotation, technical data sheet and drawing
c.prepare power transmission plan, testing plan,and shipment plan
2.In sale service
a.supervise the manufacturing schedule totally in accordance with the plan
b.send photos to customer during every manufacturing process(hold point)
c.inform the customer one week before testinng.
3.After sale service
a.installation and commissioning, training the workers
b.quick response within 12 hours any time
c.provide 12 months gurantee period normally.

 

Company Information

1.Our Company And Customers

2.Welcome To Contact Us

 

FAQ

3.FAQ For You

1. Q:What is your delivery time ?
A: Depend on the type of transformer.
2. Q:What is your payment term?
A: 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q:What kind of starndard you follow?
A: IEC, ANSI, CSA, GB, etc
4. Q:What kind of supporting documentation you can provide normally
A: Quotation,outline drawing,manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list,etc
5. Q:What is your normal wanrranty period?
A: 12 months after transformer operation.
6. Q:Can u do installation and commissioningin user's site?
A: Yes, we can send our installation team to user's country for service.
7. Q:Do you have any experience in this kind of transformer?
A: Yes, we can provide reference list for check.
8. Q:Are you manufacturer or trading company?
A: Manufacturer and Trading company.