11/0.433kv 35kV 110kV dyn11 Steel making electric arc furnace transformer 12MVA

FOB Reference Price:Get Latest Price
$40,000.00 - $250,000.00 / Set | 1 Set/Sets Electric arc furnace transformer (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
YUANGUANG
Model Number:
HSSPK-110kV
Usage:
Power
Phase:
Three
Coil Structure:
Toroidal
Coil Number:
Autotransformer
Tap changer:
NLTC/OLTC
Cooling type:
OFWF
High voltage range:
33-110kV
Rated power range:
10000-80000kVA
Connection Symbol:
Dd0 Yd11 Ynd11
Windings material:
Copper
Iron core:
Silicon sheet
Standards:
IEC,GB,ANSI
Transformer:
Electric arc furnace transformer
Losses:
Low losses
Supply Ability
Supply Ability:
5000 Set/Sets per Year Electric arc furnace transformer
Packaging & Delivery
Packaging Details
Electric arc furnace transformer main body in nude , the accessories packing in seaworthy standard wooden case
Port
Shanghai / Ningbo
Lead Time :
Arc furnace transformer 35-60 days

 

 

Product Description

1.Pictures Of  Electric arc furnace transformer

2.Descriptions Of  Electric arc furnace transformer 

furnace transformer   electric arc furnace transformer   electric transformer 
1Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. 
2 Arc furnace transformers used for steel-smelting 
3including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type
4Blast furnace transformers used for semlting of iron alloy, silicides, calcium  carbide
5single phase, three phase, load ratio voltage regulator and no-load voltage regulator
6All are energy-saving products with low power loss. 
7Furnace transformers cooling modes are  self-cooling mode,   forced water cooling mode.

 

you may like

3. More Products To Choose 

        power transformer                  oil immersed transformer            furnace transformer        power transformer

    Pad-mounted Transformer           dry type transformer           distribution transformer         transformer substation     

4. Product Structure Diagram And Quality Control

 

Technical Parameters

5.Technical Parameters Of Product

Arc furnace transformers Main Technical Parameters for  HS, HSZ, HSSPK, HSSP, HJSSP HJSSPZ Series   

33kV-110kV Level Arc furnace transformer:

Rated power (kVA)Primary voltage (kV)Secondary Step Voltage (v)Rated Secondary Current (A)Connection  symbolShort-Circuit impedance (%)Cooling Method
1000035
66
1024 056Dd0
Yd11
Yad11
7~8OFWF
OR
OFAF
125001126 729
160001230 287
2000035
66
110
1333 9626~7
(35kV)

7.5~8.5
(66kV, 110kV)
250001437 984
315001642 792
400001848 619
500002054 467
630002262 176
800002569 982

6.Certifications And Workshop Of Product

7.Function And Features Of Product

On-load-tap-changing Electric Arc Furnace Transformer  
1)Low loss4)High efficiency 7)Pretty outline and compact structure
2)Low noise5)Easy maintenance8)100% guaranteed no leakage
3)Operation reliability 6)Low partial discharge 9)Strong mechanical strength and short-circuit with

 

Electric Arc Furnace Transformer Introduction to Products
1Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. 
2 Arc furnace transformers used for steel-smelting 
3including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type
4Furnace transformers used for semlting of iron alloy, silicides, calcium  carbide
5Load ratio voltage regulator and no-load voltage regulator
6All are energy-saving products with low power loss. 
7Transformers cooling modes are self-cooling mode, forced water cooling mode.

8.Installation And Packing Of Product

 

Our Services

9. Our Best Service For You

1.Pre sale service
a.make technical solution
b.send quotation, technical data sheet and drawing
c.prepare power transmission plan, testing plan,and shipment plan
2.In sale service
a.supervise the manufacturing schedule totally in accordance with the plan
b.send photos to customer during every manufacturing process(hold point)
c.inform the customer one week before testinng.
3.After sale service
a.installation and commissioning, training the workers
b.quick response within 12 hours any time
c.provide 12 months gurantee period normally.

 

Company Information

1.Our Company And Customers

2.Welcome To Contact Us

 

FAQ

3.FAQ For You

1. Q:What is your delivery time ?
A: Depend on the type of transformer.
2. Q:What is your payment term?
A: 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q:What kind of starndard you follow?
A: IEC, ANSI, CSA, GB, etc
4. Q:What kind of supporting documentation you can provide normally
A: Quotation,outline drawing,manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list,etc
5. Q:What is your normal wanrranty period?
A: 12 months after transformer operation.
6. Q:Can u do installation and commissioningin user's site?
A: Yes, we can send our installation team to user's country for service.
7. Q:Do you have any experience in this kind of transformer?
A: Yes, we can provide reference list for check.
8. Q:Are you manufacturer or trading company?
A: Manufacturer and Trading company.